Permit Issuance

 

   For the issuance of each mechanical permit .................... 40.00

   For issuing each supplemental permit for which the original permit has  not expired, been canceled

   or  finalized .................... 8.58

   New Single Family Residence (Heat only)....................162.00

  New Single Family Residence ( Heat & A/C)...................172.50

 

Unit Fee Schedule (in addition to Permit Issuing Fee)

Furnaces (Gas or Propane)

 

   For the installation or relocation of each forced-air or gravity-type furnace or burner, including

   ducts and vents attached to such appliance, up to and including 100,000 BTU/H

   (29.3KW)  .................... 15.75

   For the installation or relocation of each forced-air or gravity-type furnace or burner, including

   ducts and vents attached to such appliance, over 100,000 BTU/H (29.3KW) .................... 19.30

 

   For the installation or relocation of each floor furnace, including vent .................... 15.75

 

   For the installation or relocation of each suspended heater, recessed wall heater or floor-mounted

   unit heater .................... 15.75

 

  Propane furnace detectors (required).................................17.82

Appliance Vents

 

   For the installation, relocation or replacement of each appliance vent installed and not included

   in an appliance permit .................... 7.75

Repairs or Additions

 

   Boilers, Compressors and Absorption Systems

 

   For the repair of, alteration of, or addition to each heating appliance, refrigeration unit, cooling unit,

   absorption unit, or each heating, cooling, absorption or evaporative cooling system, including

   installation of controls regulated by the Mechanical Code .................... 14.55

 

   For the installation or relocation of each boiler or compressor to and including 3 horsepower

   (10.6KW), or each absorption system to and including 100,000 BTU/H (29.3KW) .................... 15.60

 

   For the installation or relocation of each boiler or compressor over 3 horsepower (10.6 KW) to

   and including 15 horsepower (52.7 KW), or each absorption system over 100,000 BTU/H (29.3 KW)

   to and including 500,000 BTU/H (146.6 KW) .................... 28.80

 

   For the installation or relocation of each boiler or compressor over 15 horsepower (52.7 KW)

   to and including 30 horsepower (105.5 KW), or each absorption system over 500,000 BTU/H

   (146.6 KW) to and including 1,050,000 BTU/H (293.1 KW) .................... 39.50

 

  

 

   For the installation or relocation of each boiler or compressor over 30 horsepower (105.5 KW)

   to and including 50 horsepower (176 KW), or each absorption system over 1,000,000 BTU/H

   (293.1 KW) to and including 1,750,000 BTU/H (512.9 KW) .................... 58.80

 

   For the installation or relocation of each boiler or compressor over 50 horsepower (176 KW),

   or each absorption system over 1,750,000 BTU/H (512.9KW) .................... 98.30

 

Air Handlers

 

   For each air-handling unit to and including 10,000 cubic feet per minute (cfm) (4720 L/S), including

   ducts attached thereto .................... 11.30

 

    Note: This fee does not apply to an air-handling unit which is a portion of a factory-assembled

   appliance, cooling unit, evaporative cooler or absorption unit for which a permit is required

   elsewhere in the Mechanical Code.

 

   For each air-handling unit over 10,000 cfm (4720 L/S) .................... 19.20

 

Evaporative Coolers

 

   For each evaporative cooler other than portable type .................... 11.30

 

Ventilation and Exhaust

 

   For each ventilation fan connected to a single vent .................... 7.70

 

   For each ventilation system which is not a portion of any heating or air-conditioning system

   authorized by a permit .................... 11.30

 

   For the installation of each hood which is served by mechanical exhaust, including the ducts for

   such hood .................... 11.30

 

Incinerators

 

   For the installation or relocation of each domestic-type incinerator .................... not allowed

 

   For the installation or relocation of each commercial or industrial-type incinerator .................... 79.00

 

Miscellaneous

 

   For each appliance or piece of equipment regulated by the Mechanical Code but not classed in

   other appliance categories, or for which no other fee is listed in the table .................... 11.30

 

   When Chapter 13 is applicable, permit fees for fuel gas piping shall be:

 

   Gas Piping System

 

   For each gas piping system of one to four outlets .................... 6.50

 

   For each additional outlet exceeding four, each .................... 1.20

 

   When Chapter 14 is applicable, permit fees for process piping shall be as follows:

 

   For each hazardous process piping system (HPP) of one to four outlets .................... 5.95

 

   For each hazardous process piping system of five or more outlets, per outlet .................... 1.20

 

   For each non-hazardous process piping system (NPP) of one to four outlets .................... 2.40

 

   For each non-hazardous process piping system of five or more outlets, per outlet .................... .60

 

Other Inspections and Fees

 

 

   Inspections outside of normal business hours, per hour

   (minimum charge of two hours) .................... 35.00*

  

   Inspections for which no fee is specifically indicated, per hour

   (minimum charge of one-half hour) .................... 35.00*

 

   Re-inspection fees assessed under provisions of Section 116.6,

   per inspection .................... 35.00*

   Additional plan review required by changes, additions or revisions to plans or to plans for

   which an initial review has been completed (minimum charge of one-half hour) .................... 30.00

   *Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include

     supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved.

 


Effective July 25, 2005

   Top of Page

 

This Page Last Updated 02/16/2005

Hampton Charter Township, MI

"On the Bay"

 

 

Township Directory


Board of Trustees

Township Supervisor

Township Clerk

Township Treasurer


D.P.W. (Water, Sewer, Roads)

Parks & Recreation

Police Department

Fire Department

Building Inspections


Permit Applications

Zoning Applications

Fee Schedules

Policies/Procedures


Agenda and Minutes

Meeting Calendar

Organization Chart


Boards/Commissions

Planning and Zoning

Economic Development


Public Documents

Tax Assessing Information

FY Budget

Township Newsletter


Contact Us

Links to Other Web Sites